Monday, July 16, 2012

PLYWOOD FLOORING






A two plywood flooring is installed to raise the tent structure. A decking material is laid out on top of the plywood, and then the tent structure goes up followed by the branded roof vinyl.

HEIGHT DIFFERENCE


We had an 18" difference in height from the front decking area to the back of the tent. We corrected that with 4"x6" studs.

NESPRESSO SANTA BARBARA

Laying out the 2" x 6" frame for the flooring.

NESPRESSO SANTA BARBARA

Site for the Nespresso Tent at the Santa Barbara Polo Club.